Skip to main content
Skip table of contents

Power control (Hybrid EMS)

Last modified:

Note

The content on this page refers only to the blue'Log XC combined with the Hybrid EMS licence.

Power control: basic approach

If you want to operate your blue'Log for power control purposes, the following is one possible setup workflow. If you do not carry out the steps in this order, power control may not function properly. 

  1. Configure plant data for PV, battery, or both.

  2. Plan your master-slave setup.

  3. Configure active power and reactive power (if applicable).

  4. Activate power control.

  5. Check one of the following to confirm that power control is working properly:

    • Power Control > Overview

    • Cockpit > Charts: Select the relevant values and view them in the chart.

Caution

Activate the Power Control toggle at the top of the page ONLY after you have fully configured your power control setup.

image-20250804-111845.png

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.