Skip to main content
Skip table of contents

Power control (with Hybrid EMS)

Last modified:

The power control Overview page displays the values for active power, reactive power, and measured values at the grid connection point (also known as GCP or point of common coupling). A blue'Log XC is required to carry out power control functions.

Power control: basic approach

If you want to operate your blue'Log for power control purposes, the following is one possible setup workflow. If you do not carry out the steps in this order, power control may not function properly. 

  1. Configure plant data for PV, battery, or both.

  2. Plan your master-slave setup.

  3. Configure active power and reactive power (if applicable).

  4. Activate power control.

  5. Check one of the following to confirm that power control is working properly:

    • Power Control > Overview

    • Cockpit > Charts: Select the relevant values and view them in the chart.

Power control topics

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.